Projects

This home has been empty for 2 years. The heat kept at 55 degrees.. needless to say, there is a lot of work to be done before move-in.

Inside:
  • Fix & caulk walls (cracks and such where needed). This took 3 weeks for a crew of 3-4!
  • Paint the entire house.
  • Faux paint in the dining room and part of the powder room.
  • Replace all counter tops with granite counter tops. (except for laundry room which we didn't mind the wood laminate, the kitchen which already had granite, and the basement where there are corian counter tops).
  • Replace the fireplace granite on the family room side.
  • Replace all carpets except basement.
  • Remove carpet from formal living room and install hardwood floors.
  • Refinish all hardwood floors.
  • Install drapes in kitchen, family room, dining room, living room, office, and bedrooms.
  • Remove large mirror from Powder room. Replace w/ a nice mirror. Wall paper.
  • Move in and decorate!
Outside:
  • Remove dead trees from front and back.
  • Remove all trees in designated area to create more of a backyard.
  • Grass and landscape new lawn areas.
  • Fix brick pavers in front & up front stairs.
  • Fix and update landscaping